During the 800 day period starting September 17, 2022, 1 accessibility tests of git.pld-linux.org have been done. Throughout the whole testing period, git.pld-linux.org was up 1 times, the most recent uptime was on September 17, 2022, when a code 200 was returned. Git.pld-linux.org did not encounter any incidents of unavailability as of November 25, 2024, according to checks conducted. As of November 25, 2024, based on all responses received, there have been no error status codes in any of the replies. Git.pld-linux.org responded in 0.001 seconds on September 17, 2022, contrasting its 0.001 seconds average response time.